Church 10 kW solar PV system
Project Aim
To raise awareness of energy security issues in the local community
To provide a source of income for an ancient building with very high maintenance bills
To demonstrate that the local community can take responsibility for its own needs
Further details
Installation of a 10 kW solar PV system on a grade 1* listed parish church dating back to the 1100s.
Inspiration
Outcomes so far
Unexpected outcomes
Obstacles, and how we overcame them
Opposition from English Heritage, planners etc, overcome by:
1. Briefing all local groups we could possibly reach with talks about Transition and our key local projects
2. Holding a demonstration day when sample panels were lifted on to the roof and viewed from all possible observation points.
Achieving the legal faculty from church authorities took as long as getting the project together and getting planning permission - nothing we could do about this except keep chasing the church bureaucracy and waiting.
Contacts
- Login or register to post comments
- Subscribe to: This post
- Subscribe to: Posts of type Project Profile

Comments